Execution of construction works on the site
Home > Execution of construction works on the site
Driving piles for solar stations
Construction and preparation works
Solar Build company performs a full range of construction works for the construction of solar power plants. The company also works as a contractor for the performance of certain types of work.
Such works can be:
- preparation of the site for construction, removal of greenery
- vertical layout of the site
- construction of roads
- installation of structures
- arrangement of drainages
- arrangement of building foundations, transformer substations
- fence installation
- installation of video surveillance systems, alarm systems, external lighting, grounding, and lightning protection
Electrical installation works, electrical communications
- laying of low-voltage networks of 0.4 (0.8) kV;
- laying of direct current networks, stringing of photovoltaic panels
- laying of medium voltage networks 10(20), 35kV
- connecting equipment (panels, inverters, KTP, power and distribution panels, panels for own needs
- laying of cable and overhead lines
- arrangement of building foundations, transformer substations
- reconstruction of networks and equipment
Execution of "Ramming test" and "Pull-out test"
During the construction of solar plant projects, the construction site may have different types of soils that may not ensure the stability of the structure for a long period. In this case, it is necessary to conduct a test of the bearing capacity of the soil, to check how the structure will behave and what loads it can withstand under these conditions.
Also, conducting such tests is a mandatory condition in the work of large companies that own large solar stations, and is also an integral document when attracting credit investments from investment funds and banking institutions when assessing the risks of project implementation.
Solarbuild specialists perform these types of tests and provide the client with a conclusion. After conducting these tests, the client can be sure of the stability of the fastening system for a long time.
Ramming test is a test of the bearing capacity of the soil, performed by test driving piles in different parts of the land plot. As a rule, the most problematic areas are chosen and a test driving of 2-4 piles per 1 hectare is performed.
Pull-out test – a test to determine the stability of the structure in the ground, during which the maximum force of a driven pile into the ground for depression and pulling out is recorded.
Contact our specialists for advice on conducting tests at your sites!